Request Pricing
9257f6a2037ee6c574b12d93ac88fad3b951fb8d (1)

Your Import Partner

Real Businesses. Real Results.

Case Study

Discover how we’ve helped companies source smarter,
import with confidence, and grow through strategic
global partnerships.

After Before
BEFORE
AFTER
Drag to compare
$19,350 saved vs. local quotes
Material Sourced
• Sintered stone benchtops
• Handleless cabinetry
• Brushed brass tapware

https://yourimportpartner.com.au/wp-content/uploads/2026/06/kitchen-renovation-before.jpg

https://yourimportpartner.com.au/wp-content/uploads/2026/06/kitchen-renovation-after.jpg

Kitchen Renovation

$31,400 saved vs. local quotes

Materials Sourced

  • Sintered stone benchtops
  • Handleless cabinetry
  • Brushed brass tapware
Case Studies

Case Study

Kensington Apartment Kitchen

Owner Builder | Kensington, NSW

After Before
BEFORE
AFTER
Drag to compare

Owner Builder | Kensington, NSW

Kensington Apartment Kitchen

$19,350 saved vs. local quotes

Materials Sourced

  • Sintered stone benchtops
  • Handleless cabinetry
  • Brushed brass tapware

The Project

A Kensington apartment owner took on a full kitchen renovation as an owner-builder. The brief was straightforward: quality materials, a clean finish, and a process that didn’t add stress to an already demanding project.

They came to yip sourcing three things — sintered stone benchtops, cabinetry, and a sink.

The Result

By sourcing direct through yip rather than through local retail and trade channels, the owner builder saved $19,350 against comparable retail pricing across the three product categories.

Beyond the savings, the materials arrived on site coordinated and on time. Trades were able to get straight into the cabinetry installation and finished faster than expected — less time on site, less coordination overhead for the owner builder to manage.

The apartment gained meaningful value as a result of the kitchen upgrade, with the quality of the finishes reflecting well above the cost of the materials.

What Was Sourced

  • Sintered stone benchtops
  • Cabinetry
  • Sink

In Their Words

The whole process with yip was incredibly straightforward. They handled the sourcing, coordination and delivery, which made managing the renovation much easier. We saved around 30% compared to local retail pricing and the quality of the cabinetry, stone and sink exceeded our expectations. Everything arrived on time and ready for installation. I’d happily use yip again on future projects.

Sharlee R.

Key Outcomes

  • $19,350 saved against retail pricing
  • Materials delivered to site, coordinated
  • Faster than usual cabinetry installation
  • Increased property value

more case studies

You might also like

Kensington Apartment Kitchen

Get A Quote for Your Project

FAQ

Common Questions Answered.

Can’t find what you’re looking for? Get in touch and we’ll answer your specific question directly.

Have a project-specific question?

We respond to all enquiries within one business day. No sales pitch — just a straight answer.

There is no fixed minimum order value. However, the economics of importing work best at a certain scale — typically a full kitchen or bathroom fitout rather than individual items. We’ll always tell you upfront if a particular order doesn’t make financial sense to import.

From initial enquiry to site delivery, most orders take 10–16 weeks. This includes 2–3 weeks for sourcing and quoting, 4–6 weeks for factory production, 3–5 weeks for sea freight, and 1–2 weeks for customs clearance and last-mile delivery. We provide a detailed programme at the time of quoting.

We conduct quality inspections at the factory before goods are shipped. If a defect is missed and products arrive damaged or non-conforming, we manage the replacement process at no additional cost to you. This is why we only work with verified manufacturers who have agreed to our quality standards.

Yes. Most building materials attract a 5% customs duty and 10% GST on the landed value (FOB price + freight + insurance). We include all duties and taxes in our landed cost quotes so there are no surprises. Some product categories have 0% duty — we’ll identify these where applicable.

Absolutely — and most of our clients do. We typically handle the high-value, high-specification items (stone, cabinetry, tapware) where the savings are most significant, while locally sourced materials are used for structural and commodity items.

We only source products that meet the relevant Australian standards for their category. For plumbing fixtures, this means WaterMark certification. For electrical items, SAA certification. We provide full compliance documentation with every order.

Yes. For most product categories we can arrange samples prior to order. Sample costs are typically credited against your first order. Lead time for samples is usually 2–4 weeks.

From initial enquiry to site delivery, most orders take 10–16 weeks. This includes 2–3 weeks for sourcing and quoting, 4–6 weeks for factory production, 3–5 weeks for sea freight, and 1–2 weeks for customs clearance and last-mile delivery. We provide a detailed programme at the time of quoting.